Non-Transformer products of Tirathai Group of Companies consist of Maintenance of Electrical Systems for the Metropolitan Electricity Authority (MEA) and the Provincial Electricity Authority (PEA), Contractual for welding and assembling of Steel Fabrication work, Construction Project such as Turbine Building for Biomass Power Plant or Waste Power Plant, Warehouse Building and Office Building, etc.
Non-Transformer Group
Non-Transformer products of Tirathai Group of Companies consist of:
For maintenance of Electrical Systems for the Metropolitan Electricity Authority (MEA) and the Provincial Electricity Authority (PEA), such as electric maintenance lifts, excavators, poles, assembled and sold by TRT E&S to Metropolitan Electricity Authority and the Provincial Electricity Authority.
For Engineering Procurement and Construction (EPC) project and Construction Project operates by L.D.S. Metal Work Co., Ltd.
Including the making of transformer tank production of transformers, oven body of power plant components such as such as stacker, steel duct and others, E-house structure, conveyor structure and steel work piece molded from general processed steel, etc.
Including the project of design, procurement, installation, and testing of material conveyor systems for coalmine power plant business and industries that use conveyor belt systems for both domestically and internationally.
Building structure or construction or material conveying system which contains more than 50% of proportion of processed steel materials such as Turbine Building for Biomass Power Plant or Waste Power Plant, Warehouse Building, Office Building, Material Handling Machinery (only mechanical work) and other buildings for both domestic and international.
Manages by JV L.D.S.-N.D.P. (JV), currently operating at the Hongsa Mine Mouth Power Plant, Hongsa; Lao PDR under the following agreements;
dated 28 April 2015 value 1,315 million baht which revenue recognition depends on the amount of soil that can be transported each year (or an estimate income of 300 million baht per year). The contract duration is 4.5 years with conditions for reviewing every 5 years renewal throughout the project life (25 years). In the first quarter of 2019, JV did not win the bidding for the O&M WL2 project. Therefore, the whole project was end on 31/12/2019, which is expecting to close the project according to the contract conditions with HPC by 2020-2021
dated 18 May 2015 value 29 million baht per year, with a contract duration of 4.5 years with conditions for reviewing every 5 years renewal throughout the project life (25 years). In the first quarter of year 2019, JV did not win the bidding for O&M Ash. Therefore, the project will end on 31/12/2019, which is expecting to close the project according to the contract conditions with HPC within 2020-2021.
duration of 1 year with conditions for reviewing renewal every year throughout the entire project life (25 years). However, in June 2018, HPC changed the responsible party to oversee the contracting, operating, and maintenance work of the charcoal conveyor system. For the operation and maintenance project of the Lignite Hongsa Thermal Power Plant, Lao PDR to the Electricity Generating Authority of Thailand (EGAT). The JV has signed a contract for the operation and maintenance of the coal conveyor system for the operation and maintenance project of the lignite Hongsa Thermal Power Plant, Lao PDR in conjunction with EGAT (O&M Line Coal) on 15 June 2018, with 2 years contract duration. O&M Line Coal’s contract will be ending by 30/6/2020.
Coverage
Industries and sector coverage
INTERNATIONAL COVERAGE
Our services cover business segments and areas such as Turbine Building for Biomass Power Plant or Waste Power Plant, Warehouse Building and Office Building, etc.